I want to know what the code says about taps on service conductors.
I have an electrical installation that has a 200A meter base without breaker and on the load side there is a junction box where a 1/0 AWG service is tapped by at #2 and #4 AWG conductor that both go into panelboxes to 80 and 70 Amp breakers respectively.
Is this installation up to code?