I recently had to pull (12) 18ga control wires and a CAT5 cable through a short run of 1/2" EMT. I really wish it had been larger pipe, but it was existing, and passed though a reinforced concrete wall almost 18" thick (no drilling new/larger holes, per the engineer). The 18ga wires were 24vdc control wires protected at 2A, and the CAT5 was Ethernet. It helped that there were only 2 shallow bends in the run of pipe.
No issues with the pull, but it was only about 10ft. Not my favorite day, but it actually went pretty well. The pipe's certainly full, but not so tight as to damage any of the wires. We do strange things in special effects sometimes.
SceneryDriver