rasmithircgov.com
Member
- Location
- Florida
My jurisdiction is revisiting their temp perm or 30 day temp power. minimum requirements. Right now it is (1) service to code, and A/H and A/C' breakers installed only in the panel boards with one 110v and/or one 240v gfci protected outlets. (for wood floor sanding and wood trim work.)Or, (2) The entire job completed with the exception of some missing fixtures etc. (you know homeowner supplied stuff and how that goes.)We are tring to find out what other juresdictions require and should we be including or excluding anything from what we require for this application may it be proceedures and or requirements. (And yes please leave out code data we are set with plenty of that info). We are looking for minimum and max requirements.We would appreciate any and all imputs. you may e-mail me directly if you wish.
Thank you for your help
Thank you for your help