We have a 15,000sq/ft building with a large job trailer(100A). We have a 225A 120/208V panel on a temporary skid. The only contract obligation is temp power boxes, temp lights and the trailer. The plan calls for: (10) power boxes and about (25) 100w lights. It will be a change order to add more power, so no cost to us. But I’d like to find the formula or way to determine temp power needs for future projects.