Looking for suggestions on best method to install a temporary feeder approx. 600 ft, outdoor, across the surface of a landfill. There would be no traffic. Feeder would be 150A, 480 VAC.
I'm not familiar with what wire/cable methods would normally be used for this type of temp feeder, how it would be protected (physically). Field has suggested everything from 3/C cable across the ground to conduit.
I'm not familiar with what wire/cable methods would normally be used for this type of temp feeder, how it would be protected (physically). Field has suggested everything from 3/C cable across the ground to conduit.