I'm being asked to run a 2" RGS conduit w/ 4#1/0 and #6 from this panel? It looks pretty crowded. Do you see any issues?
 

Attachments

  • Screenshot 2023-08-10 115101.jpg
    Screenshot 2023-08-10 115101.jpg
    184.7 KB · Views: 25
  • Screenshot 2023-08-10 115121.jpg
    Screenshot 2023-08-10 115121.jpg
    138 KB · Views: 25
  • Screenshot 2023-08-10 115531.jpg
    Screenshot 2023-08-10 115531.jpg
    22.8 KB · Views: 25
Have you verified there is actually space on top to put in another conduit of the size required? If not you might have to put some kind of a gutter or wire way on the side and run the conduit to that.
 