Open Neutral
Senior Member
- Location
- Inside the Beltway
- Occupation
- Engineer
Installing: TEMPORARY UNDERGROUND ELECTRIC SERVICE SINGLE‐PHASE, 036670 120/240 VOLT, 100 AMPS MAXIMUM per PG&E 036670.pdf
My question is about the outlets.
We'll put the whole mess under a roof atop the post, covering both the meter service/breaker panel [Cutler-Hammer EUSERC MBE1224B100BTS] & adjacent outlets.
Where do I go to for the outlet requirements; i.e. boxes/rainhoods/et. al.? What's "outdoors" and not? Assume GFI is required & even if not, I'd use same. [Hard enough to get good help without killing 'em off...]
ps: danged computers....won't let me correct the typing errors in the Subject....gno fare!!!!!
My question is about the outlets.
We'll put the whole mess under a roof atop the post, covering both the meter service/breaker panel [Cutler-Hammer EUSERC MBE1224B100BTS] & adjacent outlets.
Where do I go to for the outlet requirements; i.e. boxes/rainhoods/et. al.? What's "outdoors" and not? Assume GFI is required & even if not, I'd use same. [Hard enough to get good help without killing 'em off...]
ps: danged computers....won't let me correct the typing errors in the Subject....gno fare!!!!!
Last edited: