im remodeling an old buildingthat has single phaseservice. at the same site i am also building a new addition.the new additoin is three phase.from the new building im supposed to run three phase to a disconnect(line side)and come out single phase(load side)then to a single phase transformer.to me it doesnt make sense leaving a leg floating.anyone ran into something like this before