enireh
Senior Member
- Location
- Canyon Lake,TX
I'm doing a 320 amp service at a primary pole for a farm with two structures both with meters. We are doing away with the meters so we have one meter at the new 320 amp service. The old services have three wire to them. When the new service gets connected, the old ones will be disconnected. I want to leave the wire going to them so it would be easy hooking them in at new service. Is it ok to drive a ground rod at the old services and separate the grounds and neutral there?
thank you
thank you