I need a second set of eyes on this, mine see a violation.
Structure #1, fed by existing 200a service which presently feeds pool heaters. (a condo clubhouse)
New pedestal mount service 30' off the wall of structure #1, meter and fused disco. Ec wants to run from new pedestal, up wall and THRU structure #1 and back out and underground to get to the other side to re-feed pool heaters with new load center.
Has the intent of 230.3 been met with the fused disco? Grounding electrode system(s)?