TIme On Site/Sequence

Status
Not open for further replies.

Alwayslearningelec

Senior Member
Location
NJ
Occupation
Estimator
Have small job about 40’x 30’ with only lighting and power and some tel/data stubs. Not a lot.

So obviously guys need to get roughing in before walls and ceilings go up.

We are trying to spend as little rime as possible on site.

Regarding other trades once stud walls go up then they sheetrock soon after?

Would like to wait until ALL walls go up before going back to site.
 
Yes. Attached is the power for the job I'm talking about. Not sure of roughing of these receptacles would take a day...maybe a few days.
Others thought on rought time would be great. It's all MC cable.
 

Attachments

  • Screenshot 2023-05-11 130240.jpg
    Screenshot 2023-05-11 130240.jpg
    233.3 KB · Views: 11
Juct curious. How long(roughly) would it take you to rough out the receptacles in the previously attached drawing? MC cable tying into existing ceiling circuit in aread.
 