The EE that is preparing some drawings for a Marina I'm wiring is using 80% of the rating of the receptacle for the service calculation and then applying the derating allowances of (doing this from memory, I'm sitting in a hotel w/out a code book) 555.12 .
I asked about this and he said the receptacles are not supposed to be loaded more than 80%.
I'm not sure this is 100% correct, but I don't know if I should actually question his methodology. As an EE he has the privilege of designing this way (I think). As an EC, I'm not sure it is my responsibility to question (more firmly) his thinking. I'm more inclined to be the "dumb contractor" and let it slide.
What say y'all?
I asked about this and he said the receptacles are not supposed to be loaded more than 80%.
I'm not sure this is 100% correct, but I don't know if I should actually question his methodology. As an EE he has the privilege of designing this way (I think). As an EC, I'm not sure it is my responsibility to question (more firmly) his thinking. I'm more inclined to be the "dumb contractor" and let it slide.
What say y'all?