All,
If we have a tower, currently has 3 grounds rods, all interconnected. All of the ground rods are buried under ground. From the tower legs, there are 3 #2 conductors leading to those buried ground rods (part of the conductors are above the ground).
If I need to connect more systems to the ground, may I bond the new #2 conductor to one of the three #2 conductors mentioned above using a 'split bolt connector' ??
Thanks