I would like to know how you guys understand this part on the code that says: An ADDITIONAL load of 150 VA shall be included per every 2' of track. Does this mean that on top of your connected load (track heads) you should apply the extra 150 VA or only if you calculate you service size using table 220.3(A)? How do you calculate the lighting load on a panel that has some track lighting connected to it?