So here's my first attempt at this... I have recently began an installation of a standby generator with Service Entrance Transfer switch for a client. The transfer switch will be installed between the meter and the load center. Currently the load center is the service entrance. Where should the neutral and ground be bonded? Should I do this in the transfer switch and separate in the Load center or can I separate in the transfer switch and leave it bonded in the load center. I believe I already know the answer but a second opinion never hurts.