Kjc59
Member
- Location
- Audubon, NJ
I had a 1200A Asco Transfer Switch with 8 conduits coming in from the 2 sources. I need to go back out with 4 sets of conduits underground again to the final destination. That’s a lot of conduits in and out of this switch. Would you guys come out the side into a pull box and then go underground? Into LB’s the down?
Sent from my iPhone using Tapatalk
Sent from my iPhone using Tapatalk
