In industrial application, we have a MV 4.16kV Transformer that is feeding one MCC line up. Both Transformer and MCC are located outdoor, specific for MCC is located under shelter. We have an initiative to add 1 MCC line up that will be tied in directly to the secondary side of transformer. Is this comply with NEC? Please for your feedbacks and comments. Thank you.