Thenooberus
New User
- Location
- Arizona
- Occupation
- Electrician
Our team is in charge of running ground from building to transformers. We’re using pvc raceways. Running 2awg from the building ground bars to 75 kv transformers. We use 3/4 metal cable gland connectors to enter the transformer. Some argue we should switch to pvc cgb connectors or have to install bond bushings on the metal connectors. In my case do I need a bond bushing? Or switch to pvc cgb?