So I want to install a 480/277V 100A main breaker subpanel from a 480V buss duct. I figure a 75kva transformer is appropriate for this. Using Ohms law, I get about 90A rated current for a 75kva at 480. So 90 x 1.25 = 112. So I will fuse the primary and secondary both at 100A. Sound about right?