A building load (Diversified Load) is 433kw, and all the attached load is 1-Phase load, not any single load is 3-phase in building! Should we divide load by 3 to make it 3-phase arrangement for transformer sizing or we should simply divide it P.F to size transformer? (3-ph VAC=415, 1-Ph VAC=230).