We are specifying the pre-purchase of a 2,000 kVA oil filled pad mount transformer, due to the long lead time of the equipment.
What acceptance tests should we have performed when the transformer arrives to verify the transformer arrived OK? We have already specified a shock sensor for the packaging, but I suspect a TTR, PI, perhaps an oil sample/DGA test?
Thanks.