I know the target point for Bonding a XFRM / First Overcurrent either Panel or disconnect can be done at either place.
Which is the best method?
If I put all including Steel, Water Pipe, Rebar, Ground Rods and equipment grounds at the first overcurrent device do I still need to bond XO to the enclosure of the XFRM?
Which is the best method?
If I put all including Steel, Water Pipe, Rebar, Ground Rods and equipment grounds at the first overcurrent device do I still need to bond XO to the enclosure of the XFRM?