Hey I have a 100A feed in an EMT pipe that will be going to a junction box. There is no EGC pulled, Just 2 un grounded and grounded conductor [#2's] They will terminate in the j-box, then I am going to transition to 2/3 romex wich will then drop down into the new panel. As far as keeping the ground to code, do I need to use a bonding bushing in the j-box and tie that to the romex ground which lands in the panel?
For some reason, I think there is more to it than that but I have been in their attic too long today.
Thanks guys,
~Matt