I'm running some flex through a non plenum ceiling (above acoustical grids) when I transition up through the skirt into the RTU when exactly do I transition from flex to seal tight??
Right where seal tight crosses roofline ?
slightly before or slightly after or does it really matter at all? Where does it go from damp location to dry location ????