fisherelectric
Senior Member
- Location
- Northern Va
I have a residential 200 amp service with exterior service disconnect, 200 amp breaker & enclosure. SER cable to 200 amp panel in the basement (sub-panel). Homeowner wants a wholehouse automatic standby generator installed. Is it permissible to intercept SER cable before subpanel and install transfer switch, or must I replace outside service disconnect with transfer switch? Does the transfer switch have to be the service equipment?