Leos98
Member
- Location
- Westchester, NY
Hello,
We are facing the following situation. Our customer wants a generator to back up his whole service, it is a 400A, single phase 120/240V service. So we are installing a 36KW and a 400A service rated ATS, no problem there. However, the property has a backup generator which does partial loads. It is an existing 15Kw generac genset which is backing a 100A panel via a 100A 'not service rated' ATS. We would like to know if we can leave the existing generator and set it 100A ATS as a MTS and control the existing 15Kw genset manually. What this achieves is that in any circumstances in which the man generator fails, the client can have the same backup he has now. Any thoughts? Do you see a problem with this? I have been researching but with little luck.
Thanks,
Leo
We are facing the following situation. Our customer wants a generator to back up his whole service, it is a 400A, single phase 120/240V service. So we are installing a 36KW and a 400A service rated ATS, no problem there. However, the property has a backup generator which does partial loads. It is an existing 15Kw generac genset which is backing a 100A panel via a 100A 'not service rated' ATS. We would like to know if we can leave the existing generator and set it 100A ATS as a MTS and control the existing 15Kw genset manually. What this achieves is that in any circumstances in which the man generator fails, the client can have the same backup he has now. Any thoughts? Do you see a problem with this? I have been researching but with little luck.
Thanks,
Leo