I am doing a 100 amp service change out for a customer. They currently do not have a grounding electrode system. Typically I would install a ground rod and waterline ground going back to the first point of disconnect. In this home the water line enters the house in a spot that we would have to cut a lot of sheet rock in order to get a #6 from the panel to the water shut off.
My question is am I able to install two ground rods 6ft apart and still pass inspection?
if so or if not what code reference?
I was looking in 250.53 A2 I feel like the answers yes but I want to be 100% sure.
My question is am I able to install two ground rods 6ft apart and still pass inspection?
if so or if not what code reference?
I was looking in 250.53 A2 I feel like the answers yes but I want to be 100% sure.