Location: NYC
NEC: 2008
For fire pump feeder and service conductor required to have 2-hour fire rate. per 695.6(A)(B) See attached picture.
If I have existing SEB in the basement corridor, I am going to have meter and service switch for fire pump next the SEB.
Per code, I need concrete encased (one of option) the conductor for fire pump.
Question: what about the small piece of conductor inside the equipment? does it need 2 hour fire rate? if yes, how? If no, why? any code section talk about this? Thank you.




NEC: 2008
For fire pump feeder and service conductor required to have 2-hour fire rate. per 695.6(A)(B) See attached picture.
If I have existing SEB in the basement corridor, I am going to have meter and service switch for fire pump next the SEB.
Per code, I need concrete encased (one of option) the conductor for fire pump.
Question: what about the small piece of conductor inside the equipment? does it need 2 hour fire rate? if yes, how? If no, why? any code section talk about this? Thank you.