I have a 400 amp service panel on a building and right next to it a 225 amp sub panel that feeds small A/C units. The service panel has a ground rod and GEC, does the sub panel need to have a GEC connected to the rod? What Code article covers this? I think the equipment ground from the service panel is sufficient.