john2016
Member
- Location
- California
- Occupation
- Electrical Engineer
Is it allowable per code to run two separate panelboard feeders in the same conduit? I have a case where the electrician is asking if they can run two separate feeder wires from the same distribution panel in one conduit. What they would do is provide two breakers in the distribution panel for each panelboard. Provide one conduit out of the distribution board and run it to a location within the building. Near where they would located the two panelboards, they would provide a pullbox and then split the feeders at the pullbox to each panelboard. I believe it's allowable but the wires would need to be upsizes for derating purposes. I was looking for a code article that addresses this but can't seem to find one. Could someone please point me in the direction? Thanks.