The situation is this is a 480 vac lift station, one service comes from the power co to the meter can and then to the double throw switch. The second one comes from a stand by generator and it goes to the Automatic transfer sw and then to the double throw switch. My question is can I run the conductors from the power co to the ATS in the same conduit coming from the ATS to the control panel?
View attachment 239
View attachment 239