Seriously.
While replacing a switch in a metal 4” square box, I noticed the ground wire was not pigtailed to the box.
Instead, it was cut a little long, looped around the ground screw, then continued to the switch. Does this circumvent the concept of two wires under one screw? Is this code compliant? Seems you couldn’t get even pressure on the conductors.