Ufer earth:
I didn’t want hijack http://forums.mikeholt.com/showthread.php?t=192662
Ufer earthing is now in BS7671. In my early days in the trade as an apprentice we built a new substation. The rebar was cad-welded to 1 x ⅛ copper tapes around the foundations. In the above thread mention is made of clamps that can be used in place of cad-welding, has anyone got a link to these clamps?
I can foresee a problem with this new BS regulation, mainly the builders wanting to get the slab finished and the electrician showing up two days later.
BS = Male Bovine Exciment.
I didn’t want hijack http://forums.mikeholt.com/showthread.php?t=192662
Ufer earthing is now in BS7671. In my early days in the trade as an apprentice we built a new substation. The rebar was cad-welded to 1 x ⅛ copper tapes around the foundations. In the above thread mention is made of clamps that can be used in place of cad-welding, has anyone got a link to these clamps?
I can foresee a problem with this new BS regulation, mainly the builders wanting to get the slab finished and the electrician showing up two days later.
BS = Male Bovine Exciment.