For a ufer (CEE) the NEC says at least 20 ft of 1/2" rebar. Does that mean on continous, solid 20 ft section or can sections be tied together with the normal ties to make up the 20 ft?
CA, does a building require Ufer grounding or is a ground rod suitable?