I terminated the Ufer ground wire to the *
ground bonding screw in the transformer.
The other two green wires are bonding the Service panel(3ph *
277/480V) and the Bldg panel (1ph 120/208V) panel.
However the City Inspector is asking to intercept the Ufer ground *
wire(with exothermic procedure) to either Service or Building Panels.
Please advice
ground bonding screw in the transformer.
The other two green wires are bonding the Service panel(3ph *
277/480V) and the Bldg panel (1ph 120/208V) panel.
However the City Inspector is asking to intercept the Ufer ground *
wire(with exothermic procedure) to either Service or Building Panels.
Please advice