We upgrade 200amp main meter panel box in California Los Angeles.
There was existing Ufer grounding system present that’s what we used for my new 200 amp panel.
My question is?is it require for me to bring an additional ground wire from the mine water pipe?
Or existing ufer ground it’s enough for this job?
There was existing Ufer grounding system present that’s what we used for my new 200 amp panel.
My question is?is it require for me to bring an additional ground wire from the mine water pipe?
Or existing ufer ground it’s enough for this job?