Hello Everyone, I am newly registered but have been referencing this site for a while now.
Do the drawings for a control panel built in a UL508A shop need to be created and signed by a PE (or under his/her direct supervision)?
I have seen signed and unsigned drawings (mostly unsigned) in my state of MN, but would like to have an actual code or statute addressing the question.
Thanks in advance for your response.
Do the drawings for a control panel built in a UL508A shop need to be created and signed by a PE (or under his/her direct supervision)?
I have seen signed and unsigned drawings (mostly unsigned) in my state of MN, but would like to have an actual code or statute addressing the question.
Thanks in advance for your response.