Good Afternoon,
We have a project where we are installing new light poles on the top of a retaining wall. I would like to surface mount schedule 80 PVC to the interior of the wall flush with grade and penetrate in and out of my concrete light standards. Would this be a code violation of 300.5. Does schedule 80 PVC fall under column 2 or 3?
We have a project where we are installing new light poles on the top of a retaining wall. I would like to surface mount schedule 80 PVC to the interior of the wall flush with grade and penetrate in and out of my concrete light standards. Would this be a code violation of 300.5. Does schedule 80 PVC fall under column 2 or 3?