Does the NEC allow running a seperate underground feed from a transformer to each end of a duplex and installing a meter and disconnecting means at each location.
This is on a military installation.
 
Re: underground laterals to a duplex

Is this procedure on the bidding documents?

Regardless, this is two dwelling units. Perfectly OK to have a service on each unit.
 