Hello Everyone,
I'm working on a project where my local Utility company (LIPA) has allowed us to have an 800A 208Y/120V service from pole mounted transformers. The run is about 50' from the pole into building. The catch is that the secondary cables coming into building will be about 1 foot over water table. The building itself will be raised about 4ft so I am not too worried once I reach the site. I am worried about the run before it hits the site. Is having cables that could potentially be underwater OK? Has any else run into this problem?
thanks
I'm working on a project where my local Utility company (LIPA) has allowed us to have an 800A 208Y/120V service from pole mounted transformers. The run is about 50' from the pole into building. The catch is that the secondary cables coming into building will be about 1 foot over water table. The building itself will be raised about 4ft so I am not too worried once I reach the site. I am worried about the run before it hits the site. Is having cables that could potentially be underwater OK? Has any else run into this problem?
thanks