Electriman
Senior Member
- Location
- TX
Greetings,
I am designing underground service and circuits for some projects. NEC does allow direct burial, PVC conduit and duct banks. Sometimes, I have to run wires a couple hundred feet in the streets and sidewalks before I get to the project location. I am thinking to use PVC SCH 80 conduit and bury it 24" below the grade. I don't want to be over design and at the same time conservative. I was wondering if you had similar experience and what you did.
Thanks in advance for sharing your experience and expertise.
I am designing underground service and circuits for some projects. NEC does allow direct burial, PVC conduit and duct banks. Sometimes, I have to run wires a couple hundred feet in the streets and sidewalks before I get to the project location. I am thinking to use PVC SCH 80 conduit and bury it 24" below the grade. I don't want to be over design and at the same time conservative. I was wondering if you had similar experience and what you did.
Thanks in advance for sharing your experience and expertise.