No such requirement in NEC.I will be installing a 200 amp service direct bared ( 24" deep ) the inspector wants me to use a 90 when coming up to the meter base. I cant find this in NEC 2014. ( pvc )
I will be installing a 200 amp service direct bared ( 24" deep ) the inspector wants me to use a 90 when coming up to the meter base. I cant find this in NEC 2014. ( pvc )