So have a job were a lot of the dist. equipment is on the slab on grade. They are running the MV feeders underground to the substation as you can see but all the other conduits feeding the slab on grade dist. equipment is run overhead. And there is a lot more than what you see in the pic. They are looking for VE ideas and someone mentioned to me why don't we run all the conduits contained within slab on grade switchgear rooms underground. Is there any reason why you wouldn't do that and just stub-up into the equipment? Why wouldn't they design/show it that way as they do the MV conduits.