bendomaniac
Member
I need to run initiation and power to a hot box location. I will be going under the existing building slab, outside to a 4" pad. Can I use sch 40 pvc for the underground and then stub up through slab and pad with rigid 3/4"? Basically, can I go from sch 40 pvc to rigid pipe and be code comlpiant?
Thank you for your time.:grin: