After reviewing 250-21 are my systems allowed to be an ungrounded?

Down stream of my service I have medium voltage switchgear feeding some transformers. 4160 delta primary 600 wye secondary. 4160 again to 480 wye sec.

Neither secondary use the x/o tap for bonding. The systems are ungrounded to the transformers.

The 600 volt system is a single VFD 1500 hp
The 480 volt system feeds an MCC with muti type loads.

I read 250-21 and feel my system does not qualify to be ungrounded, do to primary voltage and mcc loads.

Does anyone feel my system qualifies to be ungrounded?

Thank You
Paul
 