patricknola
Electrical contractor/Generac Dealer
- Location
- new orleans, La, United States
- Occupation
- Electrical contractor.
Hey Guys, I'm installing my very first generac generator. It's a 13kw with a 16 circuit ATS. Other electricians who have done this keep mentioning something about the GEC has to be unspliced. So I checked the code book myself and the first thing it says in 250.30(A)(1) is that the system GEC is to be unspliced. The way the code book words it is confusing to me. Am i ok to run GEC from generator to ground rod or do i have to run a unspliced GEC from generator to ground rod and then to meter? thanks in advance.