On December 21st of this year, NYC will finally adopt the 2020 version of the NEC with amendments (which will be called the 2025 NYC Electrical Code).
Here is the formal buildings bulletin documenting the change:
My question is regarding Section I:
Local Law 128 of 2024 enacted the 2025 NYC Electrical Code, which goes into effect on December 21, 2025. Except as provided below, the 2025 NYC Electrical Code will apply to all projects filed on or after December 21, 2025.
When they say "to all projects filed on or after December 21, 2025", what filing are they referring to? Is this the filing of all the trade drawings (arch, mech, plumbing, sprinkler, fire alarm, etc.)? Or when the electrical permit is pulled (FYI electrical drawings in NYC under 1000 KVA don't have to be filed)?
My next question is regarding Section 3:
Applications for electrical work filed on or after December 21, 2024, and associated with a new building may elect to comply with the technical provisions of the 2025 NYC Electrical Code, at the option of the owner. This allowance is irrespective of the requirement for plan review.
When they say "electrical work filed on or after", what filing are they referring to? In NYC, any installation below 1000 KVA doesn't require EPR / advisory board filing. You don't need to file drawings. So what do they mean?
The language confuses me.
Here is the formal buildings bulletin documenting the change:
My question is regarding Section I:
Local Law 128 of 2024 enacted the 2025 NYC Electrical Code, which goes into effect on December 21, 2025. Except as provided below, the 2025 NYC Electrical Code will apply to all projects filed on or after December 21, 2025.
When they say "to all projects filed on or after December 21, 2025", what filing are they referring to? Is this the filing of all the trade drawings (arch, mech, plumbing, sprinkler, fire alarm, etc.)? Or when the electrical permit is pulled (FYI electrical drawings in NYC under 1000 KVA don't have to be filed)?
My next question is regarding Section 3:
Applications for electrical work filed on or after December 21, 2024, and associated with a new building may elect to comply with the technical provisions of the 2025 NYC Electrical Code, at the option of the owner. This allowance is irrespective of the requirement for plan review.
When they say "electrical work filed on or after", what filing are they referring to? In NYC, any installation below 1000 KVA doesn't require EPR / advisory board filing. You don't need to file drawings. So what do they mean?
The language confuses me.