veraniumhydroxide
Member
- Location
- PHIIPPINES
Hi, I have a load which is 35 kVA a sputtering machine, A motor which is 13 kW and another sputtering machine which has load of 20kVA. could someone help me desing the UPS and the size of battery bank? Thank you.