We are installing a 100 KVA ups in a paper mill, to feed process controls computers and instrumentation. The actual load on the ups is about 40 KVA. The contractor claims that #2 75 deg C. conductors are sufficient for the load. It appears this is supported by exhibit 220.5 in the 2005 NEC.