Hello all, This is my first Post!!
I'm from medellin, Colombia (same US voltage) and I'm an Electronics engineering but lastly focused in the power engineering (by the way It's a great field)..
My question is: the company (insurance bussines) which i work for, has planned installed a new UPS system, 1+1 parallel redundant for its data center, which actually holds a load of 50kVA,...I need to know:
1. What power capacity will be appropriated for 10 years, without thinking in upgrading the system?
I'm considering 120kva...
2. If the two UPS will be, in normal conditions, loaded at 50% max., May i estimate only the half BTU (heeat disipated) for each UPS, given that this variable in the especificationsis is at full load?
Thanks in advance
I'm from medellin, Colombia (same US voltage) and I'm an Electronics engineering but lastly focused in the power engineering (by the way It's a great field)..
My question is: the company (insurance bussines) which i work for, has planned installed a new UPS system, 1+1 parallel redundant for its data center, which actually holds a load of 50kVA,...I need to know:
1. What power capacity will be appropriated for 10 years, without thinking in upgrading the system?
I'm considering 120kva...
2. If the two UPS will be, in normal conditions, loaded at 50% max., May i estimate only the half BTU (heeat disipated) for each UPS, given that this variable in the especificationsis is at full load?
Thanks in advance